The amount of time it takes to install solar panels on a roof can vary depending on several factors, including the size of the installation, the complexity of the project, and the availability of equipment and labor. In most cases, a small to medium-sized solar panel installation can be completed in just a few days.

Before the installation process can begin, there are several preparatory steps that must be taken. This may include obtaining any necessary permits or approvals from local authorities, conducting a site survey to determine the best location for the solar panels, and designing the layout of the solar power system. These steps can take a few weeks to complete, depending on the specifics of the project.

Once all of the necessary preparations have been made, the actual installation of the solar panels can begin. This typically involves mounting the solar panels to the roof or ground-mounted structure, connecting the panels to the inverter and electrical panel, and testing the system to ensure that it is functioning properly.

Link to Numsolar configurator, contains visual elements like: google map, 3D house visualization, summary SVG chart. Numsolar configurator link. Estimate duration and availability of the installers in your area

A small to medium-sized installation may be completed in just a few days, while a large or complex installation may take longer.