In short
- Paid back in
- 12.3–29.7 years 20 panels facing south in 20 cities.
- Net over 25 years
- −23 587 kr–153 988 kr The lowest and the highest of the cities.
- Solar per kW
- 889–1,061 kWh Per kW of panels a year, facing south.
SE1 has a lot of power and few people to use it
Sweden is split into four price zones.
Luleå is in SE1, the one furthest north. A lot of power comes from hydro here, but few people live in the area. So the power price is often lower than further south.
We compare the same house in 20 Swedish towns. The house has 20 panels facing south, no battery and high power use. Luleå is the only town in the comparison that is in SE1.
For you, this means that a roof in SE1 gets a lower price for its power than a roof in the south.
The sun is enough, even in Luleå
So the low power price is a drawback.
But what about the sun? It is better than many people think. A roof in Luleå gets 920 kWh/kWp in a year, close to the middle value of 948 kWh/kWp for all 20 towns.
The bright summer nights do a large part of the work. But winter gives almost no power. Only 2% of the year's solar power comes in winter, the lowest in the comparison.
For you, this means that the panels in SE1 do almost all their work in spring and summer.
A low power price gives a small saving
If the sun is enough, where does the money go?
The answer is the power price. Each kWh you do not have to buy is worth less in SE1, and the power you sell also earns less.
So the house in Luleå saves 5 038 kr a year. That is the least of all 20 towns. In Umeå, which is in SE2, the same house saves 6 256 kr a year.
For you, this means that the power price, not the sun, sets the numbers in SE1.
25 years are not enough in our example
A small saving means a long wait.
In Luleå it takes 29.7 years before the system pays back. We count 25 years, so the numbers do not break even in time.
When the period ends, the result is −23 587 kr. By comparison, the middle value for all towns is 15.9 years before the system pays back.
For you, this means that solar panels in SE1 are not a quick deal, but a long-term choice.
A battery does not help in SE1
Can a battery save the numbers?
With a battery of 10 kWh, the house uses more of its own solar power. But the battery must pay back before it wears out, and we expect it to last 10 years.
In Luleå the battery needs 40.4 years to pay back. That is the longest of all towns. Even the middle value, 13.6 years, is longer than the life of the battery.
For you, this means that you should wait with the battery if you live in SE1.
Heavy snow needs a strong roof
One more thing sets SE1 apart from the south: the snow.
In Luleå the snow load is 3.0 kN/m², while the middle value for the towns is 2.0 kN/m².
Heavy snow puts demands on the roof and the mounts. At the same time, the snow lies mostly in the dark months, when the panels give little power anyway.
For you, this means that your installer should check that your roof can carry the snow.
How to work out the numbers for your own house in SE1
All in all, the sun is enough in SE1, but the power price is low and the snow is heavy.
In our example, 20 panels in Luleå do not pay back in time, and a battery makes it worse.
Your house may still be different. If you use a lot of power in the daytime, each kWh from the roof is worth more, because you do not have to buy it. Enter your address, and we work out the numbers for your roof and your use before you ask for quotes.
20 cities: 20 panels facing south
| City | Paid back in | Net over 25 years | Solar per kW |
|---|---|---|---|
| Malmö | 12.3 years | 153 988 kr | 1,061 kWh |
| Lund | 13.6 years | 125 713 kr | 1,020 kWh |
| Växjö | 13.7 years | 123 313 kr | 933 kWh |
| Västerås | 14.2 years | 113 263 kr | 945 kWh |
| Helsingborg | 14.3 years | 112 288 kr | 969 kWh |
| Uppsala | 14.8 years | 102 213 kr | 947 kWh |
| Norrköping | 15.0 years | 99 013 kr | 968 kWh |
| Halmstad | 15.2 years | 96 838 kr | 948 kWh |
| Örebro | 15.4 years | 93 013 kr | 952 kWh |
| Stockholm | 15.9 years | 85 013 kr | 972 kWh |
| Göteborg | 16.0 years | 84 838 kr | 954 kWh |
| Jönköping | 16.0 years | 83 663 kr | 924 kWh |
| Eskilstuna | 16.0 years | 84 688 kr | 943 kWh |
| Linköping | 16.8 years | 73 338 kr | 965 kWh |
| Karlstad | 17.3 years | 66 488 kr | 969 kWh |
| Gävle | 17.6 years | 63 413 kr | 933 kWh |
| Borås | 17.7 years | 61 138 kr | 889 kWh |
| Sundsvall | 20.6 years | 32 288 kr | 909 kWh |
| Umeå | 23.9 years | 6 863 kr | 900 kWh |
| Luleå | 29.7 years | −23 587 kr | 920 kWh |
A worked example for one city is on the page about Luleå.
Questions and answers
Do solar panels pay off in price zone SE1?
Not in our example. In Luleå it takes 29.7 years before 20 panels facing south pay back, and we count 25 years.
Do solar panels give power this far north?
Yes. A roof in Luleå gives 920 kWh/kWp in a year, but almost all of it comes in the summer half of the year.
Does a battery pay off in SE1?
No. The battery needs 40.4 years to pay back in Luleå, but we expect it to last 10 years.
How we made this article
- Date of the numbers
- 2026-11-16
- Calculation
- Calculation engine v2, PVGIS weather (Oct 2026), example installer prices v12
- Text
- An AI model drafted the text from our data. A person at Numsolar checked and approved it before publishing.
- Grid fee
- Växjö: a typical grid fee, because Växjö Energi’s fee follows the spot price and the calculation cannot model that. Malmö, Örebro, Norrköping: a typical grid fee, because we have not been able to read E.ON’s price list.