Solar panels · Article

EV charger and solar panels: how to install and what you gain

What decides the gain is when the car charges, not how big the charger is. If the car charges at home in the day, it saves 832 kr a year in a typical city, but charging in the evening gives almost nothing. One phase is often enough, and it suits surplus solar power better. The key points of the installation are the fuse and a charger that can read the solar power.

Published 2026-11-16

In short

Paid back in
12.3–29.7 years 20 panels facing south in 20 cities.
Net over 25 years
−23 587 kr–153 988 kr The lowest and the highest of the cities.
Solar per kW
889–1,061 kWh Per kW of panels a year, facing south.

The car saves only when it charges in the day

We ran the same house in 20 cities.

The house has 20 panels facing south and no battery, and the car drives 30 km a day.

If the car is home and charges in the day, it takes 939 kWh of solar power a year. That is the median of the cities. So the car saves between 414 kr and 1 289 kr a year, depending on the city. In Stockholm it is 826 kr.

If the car charges only in the evening, the sun is down. The car then gets almost no solar power, and the median savings are 0 kr. For you, this means that the control matters more than the charger itself.

One phase is often enough for daily use

If the car charges in the day, how fast must it charge?

A charger on one phase and 16 A charges at 3.7 kW. On three phases and 16 A it charges at 11 kW.

The car in our model uses 6 kWh a day. That takes 1.6 hours on one phase and 0.5 hours on three phases. So both are done within one sunny day.

Also check the car, because some cars charge on one phase only. Then a three-phase charger is not faster. For you, this means that one phase is often enough if the car stays at home.

Surplus solar power suits one phase better

Slow charging has one more benefit.

Surplus is solar power that the house does not use right now, and otherwise it is sold to the grid. A smart charger can send it to the car instead.

A car rarely charges with less than 6 A per phase. On one phase that is 1.4 kW, but on three phases it is 4.1 kW. If the surplus is smaller than that, the car takes power from the grid.

So one phase works better on a cloudy day. Some chargers switch between one and three phases by themselves. This means that you can often charge on solar power and still charge fast when you need to.

Load balancing protects the main fuse

Whatever the number of phases, the car shares the fuse with the rest of the house.

The main fuse sets how much power the house can take at the same time. The car, the stove and the heat pump share it.

Load balancing measures the power that goes into the house. When the house uses a lot, the charger lowers its power, so the fuse does not trip. Often you then do not need a larger fuse.

A licensed electrician must do the installation. The charger must be fixed to the wall or to a post. For you, this means that the electrician must check the fuse first.

The charger must be able to read the solar power

Load balancing protects the fuse, but charging on solar power needs more.

The charger must know how much solar power is left over. The inverter or a power meter has this data.

There are three common ways. The charger can be the same brand as the inverter. A system that controls all the power in the house can control it. Or it reads its own meter at the fuse box.

For you, this means that you should ask the installer which way works with your panels. Do this before you buy the charger.

The charger costs the same with or without solar panels

A charger with installation often costs 10 000 kr to 15 000 kr.

You need it with or without solar panels, so the panels do not make it more expensive.

For an EV charger, the green technology tax reduction is 50% of the cost of labour and material. The green technology tax reduction is at most 50 000 kr per person and year. The Swedish Tax Agency describes the green technology rules on its website.

What to do next

All in all, you gain the most if the car charges in the day.

One phase is often enough, and load balancing protects the fuse. Choose a charger that can read the solar power from the start.

With two-way charging, the car can give power back to the house. Few cars and chargers can do this in Sweden today, and it is still rare in houses. If you want to be ready, ask for a charger that can be upgraded later.

The next step is to calculate your own roof. Then you see how much solar power is left over for the car.

20 cities: 20 panels facing south

City Paid back inNet over 25 yearsSolar per kW
Malmö 12.3 years 153 988 kr 1,061 kWh
Lund 13.6 years 125 713 kr 1,020 kWh
Växjö 13.7 years 123 313 kr 933 kWh
Västerås 14.2 years 113 263 kr 945 kWh
Helsingborg 14.3 years 112 288 kr 969 kWh
Uppsala 14.8 years 102 213 kr 947 kWh
Norrköping 15.0 years 99 013 kr 968 kWh
Halmstad 15.2 years 96 838 kr 948 kWh
Örebro 15.4 years 93 013 kr 952 kWh
Stockholm 15.9 years 85 013 kr 972 kWh
Göteborg 16.0 years 84 838 kr 954 kWh
Jönköping 16.0 years 83 663 kr 924 kWh
Eskilstuna 16.0 years 84 688 kr 943 kWh
Linköping 16.8 years 73 338 kr 965 kWh
Karlstad 17.3 years 66 488 kr 969 kWh
Gävle 17.6 years 63 413 kr 933 kWh
Borås 17.7 years 61 138 kr 889 kWh
Sundsvall 20.6 years 32 288 kr 909 kWh
Umeå 23.9 years 6 863 kr 900 kWh
Luleå 29.7 years −23 587 kr 920 kWh

A worked example for one city is on the page about Stockholm.

Questions and answers

Can the car charge on solar power only?

Yes, on some days. The car must be home in the day, and the charger must follow the surplus. In winter the sun is rarely enough.

Do I need three phases to charge with solar power?

No. One phase works with less surplus, from 1.4 kW. Three phases charge faster but need at least 4.1 kW.

How much of the cost do I get back?

For an EV charger, the green technology tax reduction is 50% of the cost of labour and material. The Swedish Tax Agency describes the green technology rules on its website.

How we made this article

Date of the numbers
2026-11-16
Calculation
Calculation engine v2, PVGIS weather (Oct 2026), example installer prices v12
Text
An AI model drafted the text from our data. A person at Numsolar checked and approved it before publishing.
Grid fee
Växjö: a typical grid fee, because Växjö Energi’s fee follows the spot price and the calculation cannot model that. Malmö, Örebro, Norrköping: a typical grid fee, because we have not been able to read E.ON’s price list.

Your roof is not our reference house

Type your address. We draw the roof in 3D, place the panels and calculate with your power use, for free. North roof? Try the garage.

Calculate my own roof